page:docs-genty-features-backlog-updated-phase4-critical-path
Phase 4: Critical Path Analysis reference
The critical path is 6 nodes deep, running through the parallelization and agent-delegation domains. This is the chain that, if any node is delayed, delays the maximum number of downstream gaps.
Phase 4: Critical Path Analysis
Critical Path (Longest Chain of Unsatisfied Dependencies)
The critical path is 6 nodes deep, running through the parallelization and agent-delegation domains. This is the chain that, if any node is delayed, delays the maximum number of downstream gaps.
GAP-SUBOBS-001 (Critical, IN_PROGRESS, M)
Streaming Output Capture from Invoked Harnesses
|
v
GAP-SUBOBS-002 (High, IN_PROGRESS, M)
Subagent Progress Tracking
|
v
GAP-PAR-003 (High, IN_PROGRESS, L) [also needs GAP-PAR-001]
Multi-Harness Parallel Dispatch
|
v
GAP-AGENT-003 (High, IN_PROGRESS, L) [also needs GAP-AGENT-001]
Process Orchestration with Effect Routing
|
v
GAP-AGENT-004 (Medium, IN_PROGRESS, M) [also needs GAP-PROC-001]
Built-in Process Templates
|
v
GAP-SESSION-003 (Medium, OPEN, M)
Session Templates and PresetsWhy this is the critical path
**Node 1 -- GAP-SUBOBS-001: Streaming Output Capture** (Critical priority, M effort)
- The foundation of all subagent observability. Without streaming output from harness processes, progress tracking, health monitoring, and the entire dashboard drill-down chain are blocked.
- Currently IN_PROGRESS: Pi adapter streams via subscribe(), but CLI harnesses capture output only after process exit.
- Remaining work: Pipe stdout/stderr from child processes in real-time across all harness types.
- Unblocks: GAP-SUBOBS-002, GAP-SUBOBS-004, GAP-SUBOBS-005, GAP-PERF-004, GAP-UX-001f
**Node 2 -- GAP-SUBOBS-002: Subagent Progress Tracking** (High priority, M effort)
- Extracts progress signals (percentage, step, ETA) from streaming output. Required by the coordinator pattern to know worker status.
- Currently IN_PROGRESS: BackgroundEffectStatus tracks lifecycle but not granular progress.
- Remaining work: Progress percentage extraction, ETA estimation, progress bar support.
- Unblocks: GAP-PAR-003, GAP-SUBOBS-005, GAP-UX-001e (via implicit dependency)
**Node 3 -- GAP-PAR-003: Multi-Harness Parallel Dispatch** (High priority, L effort)
- Named effect groups with persistent identity across iterations. Multiple harnesses working concurrently on related tasks.
- Currently IN_PROGRESS: Execution waves and named groups exist, but cross-iteration team coordination is absent.
- Remaining work: Coordinator process pattern, team management across iterations, inter-effect communication during execution.
- Unblocks: GAP-PAR-010, GAP-AGENT-003
**Node 4 -- GAP-AGENT-003: Process Orchestration with Effect Routing** (High priority, L effort)
- The coordinator process template: dynamically routes work to different harnesses, aggregates progress from workers.
- Currently IN_PROGRESS: capabilityRouter.ts exists but is not consumed in orchestrateIteration.
- Remaining work: Wire capability routing into orchestration loop, build coordinator process template.
- Unblocks: GAP-AGENT-004
**Node 5 -- GAP-AGENT-004: Built-in Process Templates** (Medium priority, M effort)
- Pre-configured templates (explorer, planner, verifier, reviewer) with harness/model/capability profiles.
- Currently IN_PROGRESS: Methodology definitions are rich but not packaged as ready-to-use templates.
- Remaining work: Package methodologies with specific harness+capability configurations.
- Unblocks: GAP-SESSION-003
**Node 6 -- GAP-SESSION-003: Session Templates and Presets** (Medium priority, M effort)
- Session templates stored in
.a5c/session-templates/specifying default harness, model, breakpoints, process bindings, budgets. - Currently OPEN: No session template system exists.
Total effort on critical path: M + M + L + L + M + M = approximately XL-XXL
---
Alternative Near-Critical Paths
Path B: Streaming to UI (5 deep)
GAP-SUBOBS-001 -> GAP-PERF-004 -> GAP-PAR-006 (terminal)
GAP-SUBOBS-001 -> GAP-UX-001f -> (needs GAP-UX-001 respec first)This path is blocked on GAP-UX-001 (NEEDS_RESPEC), making it stalled rather than critical.
Path C: Memory Pipeline (5 deep)
GAP-AGENT-001 -> GAP-AGENT-006 -> GAP-STATE-001 -> GAP-STATE-002 (terminal)Shorter but feeds into important long-term memory capabilities.
Path D: Run Lifecycle (4 deep)
GAP-PROC-003 -> GAP-STATE-006 -> GAP-RUN-003 (terminal)Blocked by process versioning which has no upstream dependencies -- can start immediately.
---
Foundation Gaps (Most Downstream Dependents)
These gaps unblock the most downstream work and should be prioritized:
| Gap | Status | Priority | Direct Dependents | Total Downstream |
|---|---|---|---|---|
| GAP-SUBOBS-001 | IN_PROGRESS | Critical | 7 | 22 |
| GAP-PAR-001 | IN_PROGRESS | High | 6 | 16 |
| GAP-ECO-002 | OPEN | High | 5 | 12 |
| GAP-REMOTE-007 | IN_PROGRESS | High | 3 | 5 |
| GAP-UX-001 | NEEDS_RESPEC | High | 5 | 9 |
| GAP-AGENT-001 | IN_PROGRESS | High | 5 | 15 |
| GAP-SUBOBS-002 | IN_PROGRESS | High | 3 | 10 |
| GAP-PROC-001 | IN_PROGRESS | High | 4 | 8 |
What "Total Downstream" means
Direct dependents are gaps that directly list this gap as a dependency. Total downstream is the transitive closure -- all gaps that are blocked (directly or indirectly) when this gap is incomplete.
Key insight
**GAP-SUBOBS-001** (Streaming Output Capture) is the single most impactful foundation gap, with 22 total downstream dependents spanning subagent-observability, parallelization, performance, and user-experience domains. It should be the top priority for unblocking maximum downstream work.
**GAP-ECO-002** (CC Marketplace Protocol Support) is the highest-impact OPEN gap (not yet started), unblocking the entire ecosystem track including plugin trust, auto-update, validation, analytics, and plugin management integration.