Agentic AI Atlasby a5c.ai
OverviewWikiGraphFor AgentsEdgesSearchWorkspace
/
GitHubDocsDiscord
i.3Wiki
Agentic AI Atlas · Phase 6: Milestone Summary
docs/genty-features-backlog-updated/phase6-milestone-summarya5c.ai
Search the atlas/
Wiki · linked records

Article and nearby pages

I.Current articlepp. 1 - 1
Gap Status MatrixGenty Stack RoadmapNext StepsGap Inventory: Category SummaryPhase 1 Inventory Adversarial Check ResultsPhase 2 Codebase Audit -- Adversarial Corrections
I.
Wiki article

docs/genty-features-backlog-updated/phase6-milestone-summary

Reading · 6 min

Phase 6: Milestone Summary reference

Executive summary of the M0-M5 roadmap with effort distribution, risk profile, and success criteria.

Page nodewiki/docs/genty-features-backlog-updated/phase6-milestone-summary.mdNearby pages · 14Documents · 0

Continue reading

Nearby pages in the same section.

Gap Status MatrixGenty Stack RoadmapNext StepsGap Inventory: Category SummaryPhase 1 Inventory Adversarial Check ResultsPhase 2 Codebase Audit -- Adversarial CorrectionsPhase 2: Stale Paths ReportPhase 3: Closed GapsPhase 3: Status Reclassification -- All ChangesPhase 4: Critical Path AnalysisPhase 4: Parallel Work TracksPhase 5: Quick WinsPhase 5: Risk RegisterPhase 6: Roadmap

Phase 6: Milestone Summary

Executive summary of the M0-M5 roadmap with effort distribution, risk profile, and success criteria.

---

Milestone Overview

Code
M0  [=====]      Quick Wins + Foundation         16 gaps   ~3M effort    0 blockers
M1  [========]   Critical Path                    7 gaps   ~L-XL effort  M0 required
M2  [==========] Parallel Tracks                 16 gaps   ~XL effort    M0 required
M3  [==========] Integration                     11 gaps   ~XL effort    M1+M2 required
M4  [==========] Polish and UX                   12 gaps   ~XL effort    M0 respec + M1
M5  [===========] Ecosystem + Long-Tail          16 gaps   ~XL-XXL       M2-M4 required

---

M0: Quick Wins and Foundation

AttributeValue
**Gap count**16 actionable + 1 respec
**Effort**~3 M equivalent (11 S items + 2 M items + 1 respec session)
**Risk profile**14 Low, 2 Medium, 1 High (the respec)
**Parallel capacity**All 11 quick wins can run in parallel
**Dependencies**None -- everything can start immediately

**Success criteria:**

  • CLI harness streaming outputs in real-time (GAP-SUBOBS-001)
  • Prompt caching reduces API costs measurably (GAP-PERF-001)
  • Long-term memories appear in new run prompts (GAP-STATE-001)
  • Plugin blocklist and trust levels operational (GAP-ECO-003, GAP-SEC-002)
  • UX-001 has a written respec targeting tula-ui or observer-dashboard
  • All 8 parallel track foundations initiated

**Key risk:** UX-001 respec decision. If deferred, the entire Track 6 (13 gaps in M4) remains blocked.

---

M1: Critical Path Items

AttributeValue
**Gap count**7
**Effort**~L-XL equivalent (2 S + 4 M + 1 L)
**Risk profile**2 Medium, 4 High, 1 Critical (PERF-002)
**Parallel capacity**M1a and M1b can run in parallel. M1c depends on both. M1d is independent.
**Dependencies**M0: SUBOBS-001, AGENT-001, PROMPT-006

**Success criteria:**

  • Subagent progress displays percentage and ETA (GAP-SUBOBS-002)
  • Effects execute concurrently in orchestration loop (GAP-PAR-001)
  • Multi-harness dispatch with team coordination (GAP-PAR-003)
  • Session compaction preserves context across strategies (GAP-PERF-002)

**Key risk:** PAR-001 (concurrent execution) requires core loop changes. Feature-flag the concurrent path.

---

M2: Parallel Track Items

AttributeValue
**Gap count**16
**Effort**~XL equivalent (8 S + 5 M + 2 L)
**Risk profile**10 Low, 4 Medium, 2 High (ECO-002, REMOTE-003)
**Parallel capacity**5 sub-groups (M2a-M2e) run independently
**Dependencies**M0 track foundations

**Success criteria:**

  • CC marketplace protocol adapter works (GAP-ECO-002)
  • Remote sessions connect and deliver events (GAP-REMOTE-003)
  • Prompt plan inspection and context introspection commands available (GAP-OBS-003, GAP-OBS-005)
  • Process versioning detects mismatches on resume (GAP-PROC-003)
  • Built-in templates packaged with harness profiles (GAP-AGENT-004)

**Key risk:** ECO-002 depends on CC marketplace API stability. Abstract behind PluginSource interface.

---

M3: Integration Milestones

AttributeValue
**Gap count**11
**Effort**~XL equivalent (3 S + 4 M + 3 L)
**Risk profile**2 Low, 5 Medium, 4 High
**Parallel capacity**M3a-M3e have different dependency chains and can partially overlap
**Dependencies**M1 (critical path complete) + M2 (tracks progressed)

**Success criteria:**

  • Process orchestration dynamically routes to harnesses (GAP-AGENT-003)
  • Cross-run messaging delivers between active runs (GAP-AGENT-005)
  • Git worktree isolation prevents conflicts in parallel code tasks (GAP-TOOLS-017)
  • CC plugin compatibility layer loads CC plugins (GAP-ECO-001)
  • Context compression uses semantic families (GAP-PROMPT-007)

**Key risk:** AGENT-003 restructures the core orchestration loop. Spike and feature-flag.

---

M4: Polish and UX

AttributeValue
**Gap count**12
**Effort**~XL equivalent (2 S + 4 M + 3 L + 3 additional)
**Risk profile**4 Low, 4 Medium, 4 High (UX respec chain)
**Parallel capacity**M4a must complete before M4b. M4c is partially independent.
**Dependencies**M0 (UX-001 respec), M1 (streaming data), M3 (summarization for triage)

**Success criteria:**

  • Rendering foundation operational on chosen platform (GAP-UX-001)
  • Effect tree and streaming output panels render live data (GAP-UX-001a, GAP-UX-001f)
  • Breakpoint approval shows risk context and recommendations (GAP-UX-001c)
  • Resume dashboard with run picker works (GAP-UX-008)
  • ctx.workflow() intrinsic supports conditional branching (GAP-TOOLS-023)

**Key risk:** If UX-001 respec is not completed in M0, all of M4 shifts right.

---

M5: Ecosystem and Long-Tail

AttributeValue
**Gap count**16
**Effort**~XL-XXL equivalent (2 S + 5 M + 9 L)
**Risk profile**5 Low, 3 Medium, 8 High
**Parallel capacity**M5a-M5d have limited interdependencies
**Dependencies**Various from M2-M4

**Success criteria:**

  • OAuth and MCP authentication work end-to-end (GAP-SEC-006, GAP-TOOLS-032)
  • Session rewind restores from arbitrary journal point (GAP-STATE-006)
  • Fork-join process pattern executes parallel branches (GAP-PAR-010)
  • LSP diagnostics feed into task routing (GAP-TOOLS-012)
  • All 78 non-CLOSED gaps addressed

**Key risk:** Multiple L-effort high-risk items. Some may be deferred to future cycles if scope exceeds capacity.

---

Effort Distribution

Code
            S     M     L     Total Gaps
M0          14    2     0     16 (+respec)
M1          3     3     1     7
M2          13    1     2     16
M3          0     7     4     11
M4          4     3     5     12
M5          2     6     8     16
---         --    --    --    --
Total       36    22    20    78

S = 1-2 days | M = 3-5 days | L = 1-2 weeks

---

Status Category Distribution

StatusCountMilestone Distribution
IN_PROGRESS49M0: 12, M1: 6, M2: 10, M3: 7, M4: 8, M5: 6
OPEN22M0: 0, M1: 0, M2: 4, M3: 3, M4: 1, M5: 14
NEEDS_RESPEC7M0: 1 (respec only), M4: 6

---

Priority Distribution

PriorityCountHandling
Critical4All in M0-M1
High30Spread across M0-M3, concentrated in M0 quick wins
Medium37Spread across M2-M5
Low7Mostly M5 long-tail

---

Cross-Milestone Dependencies (Critical Chains)

Code
M0: SUBOBS-001 -----> M1: SUBOBS-002 + PAR-001 -----> M3: PAR-003 + AGENT-003
M0: PROMPT-006 -----> M1: PERF-002 -----> M3: PROMPT-007
M0: REMOTE-007 -----> M2: REMOTE-003 -----> M5: SESSION-005
M0: ECO-003 -----> M2: ECO-002 -----> M3: ECO-001
M0: UX-001 respec --> M4: UX-001 impl --> M4: UX-001a/b/d/e/f
M0: PROC-001 -----> M2: PROC-003 -----> M5: STATE-006 + RUN-003

---

Recommended Cadence

  • **M0:** 2-3 week sprint (many parallel S items)
  • **M1:** 3-4 week sprint (focused critical path work)
  • **M2:** 4-6 week sprint (5 parallel streams, longest is ECO-002 at L)
  • **M3:** 4-6 week sprint (integration work, depends on M1+M2 completion)
  • **M4:** 4-6 week sprint (UX work, can partially overlap with M3)
  • **M5:** 6-8 week sprint (long-tail, can overlap with late M4)

**Total estimated duration:** 6-8 months with 2-3 parallel contributors.

Trail

Wiki
Babysitter Docs
Genty Features Backlog: Adversarial Gap Analysis

Phase 6: Milestone Summary

Continue reading

Gap Status Matrix
Genty Stack Roadmap
Next Steps
Gap Inventory: Category Summary
Phase 1 Inventory Adversarial Check Results
Phase 2 Codebase Audit -- Adversarial Corrections
Phase 2: Stale Paths Report
Phase 3: Closed Gaps

Page record

Open node ledger

wiki/docs/genty-features-backlog-updated/phase6-milestone-summary.md

Documents

No documented graph nodes on this page.